国产成人一区二区三区影院动漫,久久久久亚洲av无码专区体验,99亚洲男女激情在线观看,久久www成人_看片免费不卡

Welcome to the official website of Shenzhen Taiyou Electronic Technology Co., Ltd!

Shenzhen Taiyou Electronic Technology Co., Ltd

20年專注于立式注塑機的生產(chǎn)與制造

24小時全國服務(wù)熱線:0755-33855605

Shenzhen Taiyou Electronic Technology Co., Ltd

Address: No.2, North 1st Road, Tianyang Third Road, datianyang Industrial Zone, Songgang town, Bao'an District, Shenzhen
Telephone:0755-33855605
Fax:0755-33855606
E-mail:twtaiyou@163.com
Website:http://dwdkj.cn

當前位置:首 頁 ? News ? Industry trends

Operation elements of vertical injection molding machine

文章出處:臺佑電子 | 作者:臺佑電子 | 發(fā)表時間:2020-07-07

In the plastics processing industry, Shenzhen Taiyou Vertical Injection Molding Machine is a kind of expensive injection molding equipment. The output of vertical injection molding products accounts for more than 30% of the total amount of plastic products. It has the characteristics of high production automation, short production cycle, strong adaptability and high production capacity. Except for fluoroplastics, almost all thermoplastics can be molded by this equipment. Relay) contactor control system is usually used for mold clamping, injection, holding pressure and mold opening of the original injection molding machine. The wiring of detection elements is chaotic, the reliability is poor, and the integration is low. In order to improve the function of the injection molding machine and improve the reliability of its production process.


The operation process of vertical injection molding machine can be roughly divided into: preheating, mold clamping, injection, calendering and holding, mold opening, top punching, flash evaporation and other processes. These processes are batch production processes, and each process can be controlled according to changes in time or direction. At different times or directions, the device's travel switch or proximity switch advocates the timer of the central processor to start timing. If the motion mechanism reaches the end point or the specified orientation within the specified time, the corresponding travel switch or proximity switch will be triggered, the system will consider that the execution of the action has ended at this time, otherwise it will stop the machine and issue a defect alarm. Because the vertical injection molding machine has many movements, some movements require skills, so multiple orientation control points must be set to switch parameters. In the process of time care, one after another is advocated, distinguishing the actions at the time, and after admitting that they are correct, opening or closing the corresponding implementing agencies and ending the routine actions. The entire production process has gone through seven processes, so this system can control the automatic end of these seven processes in turn.


The quality of the injection molded product depends on the manipulation of the technical parameters of the injection molding process, including the input variables of the simulation method, such as the barrel temperature, polymer melt temperature, screw temperature, mold temperature, injection system pressure, screw speed, etc. The digital variable method inputs variables, such as the continuous direction of the screw exit, the front and back direction of the injection seat, the front and back movement of the template, and overtravel, etc. The programmable controller technology was used to transform the injection molding machine system, overcoming the shortcomings of the traditional open-loop control method, and ending the closed-loop control, so that the anti-interference ability and control accuracy of the programmable controller control method were greatly improved compared with the traditional method. It can not only control the switching logic, but also control the analog quantity (such as temperature, pressure, flow, speed, etc.). By closed loop with the help of keyboard and liquid crystal display or digital ladder diagram, the operation process ends. There are three kinds of ladder diagram programming methods: root instruction scheme; step-by-step instruction scheme; shift instruction scheme. Flash, you can set or correct skill process parameters, and have an early warning system and defect flash indicator to monitor the production process, and then greatly advance the function of the entire machine. The transformation cost of PLC control system is low, the construction period is short, the reliability and safety of the system are significantly improved, and it has certain application value.

咨詢

Telephone

Consultation telephone

0755-33855605

Service hotline

13902910763

WeChat

二維碼

Mobile website

Mailbox

Enterprise mailbox

twtaiyou@163.com

国产成人精品电影在线观看| 亚洲国产精品ⅴa在线播放| а天堂中文在线官网在线 | 亚洲日韩精品一区二区三区无码| 亚洲精品夜夜夜妓女网| 亚洲欧美乱日韩乱国产| 天天爽天天爽天天爽| 青青草原综合久久大伊人| 久久亚洲色www成爱色| 欧美性欧美巨大黑白大战| 国产成人精品日本亚洲直播| 国产一区二区三区免费观看在线| 日本道色综合久久影院| 国产成人亚洲综合青青| 日韩a片无码毛片免费看| 午夜精品电影你懂的| 久久激情综合狠狠爱五月| 久久精品天天中文字幕人妻 | 免费国产黄网站在线观看视频| 国产无遮挡又黄又爽免费网站| 女厕厕露p撒尿八个少妇| www夜片内射视频在观看视频| 全球av集中精品导航福利| 先锋影音男人av资源| 凹凸在线无码免费视频| 在线观看国产丝袜控网站| 日韩午夜理论免费tv影院| 97se亚洲国产综合自在线观看| 欧美成aⅴ人高清免费| 日本欧美一区二区三区在线播放 | 亚洲成av人片无码天堂下载| 亚洲欧美中文日韩v在线观看| 天天澡天天添天天摸97影院| 黑森林福利视频导航| 精品国产乱码久久久久久婷婷| 国产高潮国产高潮久久久| 久久久久国产精品熟女影院| 亚洲精品无码专区在线| 五月色丁香婷婷网蜜臀av| 精品99日产一卡2卡三卡4| 欧美一区二区三区成人片在线|